Downtown Recreation Center pool gets new equipment and deck

image_pdfimage_print

The pool at the Downtown Recreation Center has been undergoing some much needed updating.

The installation of a new pool pump VFD (Variable Frequency Drive), new chemical controller and new backwash controller was recently completed and all are performing up to expectations.

The rusted rebar areas in the plaster on the pool floor have been repaired by scuba divers from Underwater Unlimited and a new pool heater is scheduled to be installed soon.

All work is expected to be completed in January 2017.