Area on the Eastside scheduled for resurfacing of streets starting Thursday Aug. 24

image_pdfimage_print

A slurry seal resurfacing treatment that provides pavement protection from weathering will be applied in an Eastside neighborhood on Thursday Aug. 24 and Friday Aug. 25.

Access through this area will be limited during the working hours of 7 a.m. to 5  p.m.

Click here to view a map that shows the Area 25 section that will be resurfaced. The area is bordered by 22nd Street to the south, Newport Boulevard to the West, Santa Isabel Avenue to north to the eastern city limits.

“No Parking” signs have been posted in the neighborhood, indicating the dates and times in which vehicles may not park, drive, or access the streets.

Cooperation in observing all traffic control and parking restrictions will be greatly appreciated and will help in expediting the construction and yielding a better finished product.

A challenge with the slurry seal treatment is minimizing the amount of tire marks upon re-opening of the streets. Slurry seal is susceptible to deformation the first week following construction.

Therefore, the city is asking for everyone’s assistance when driving on these slurried streets, to avoid making sharp turns into and out of driveways and intersections.

Vehicle power steering puts tremendous force on the pavement with little effort from the driver. Whenever possible, and safe, please make wide, fluid turns into and out of driveways and intersections to avoid digging into the slurry.